S
Sheldon Overs
Thanks Guys
This part of house was extended in 1994 and block and beam put in.
The other part of house is 1967 so is timber suspended which I will have to do without screed system.
The 100mm insulation is irrelevant to myself as its a retrofit renovation and there is no requirement for building inspector on retrofit underfloor heating.
Any advice on pipe size, 16mm or the 22/25?
Do you tile straight onto these liquid screeds?
Thanks
Sheldon
This part of house was extended in 1994 and block and beam put in.
The other part of house is 1967 so is timber suspended which I will have to do without screed system.
The 100mm insulation is irrelevant to myself as its a retrofit renovation and there is no requirement for building inspector on retrofit underfloor heating.
Any advice on pipe size, 16mm or the 22/25?
Do you tile straight onto these liquid screeds?
Thanks
Sheldon