D
Droopy
That's why i don't do it at all.So far I have done them for free, but the last one started to take the p!$$.
They asked if I would do toilet roll holder and a 4ft mirror after the tiling, I said yes.
Bathroom tiled and grouted, drilled in bog roll holder then the mirror, then out came a shower rail holder, new shower chrome pipe to connect to the bath taps, a window blind and a shower screen.
I did everything baring the shower screen, I didn't have a ceramic drill bit small enough for some of the screen fittings, and also If I didn't get the shower screen 100% right, then it may leak, and any leaking from a shower screen would be my problem, had vissions of water through the downstairs ceiling and said I can't do that, no drill bits.
Did everything else for free, though some do take the p!$$ a bit.
Too many folk extract the urine.
I now tell them that they need to wait another day or so for everything to be 100% set.