S
Spare Tool
from start to finish its a 3 day job for me and my son
hes never done a floor this way so want to do it to show him how easy it can be .if the guy puts a anhydrite leveller down hes pushing it to have it ready by july 25th
ive give him a price ,and can fit him in end june and saving him money and stress hes already had a 7 week delay with his conservatory and the money I can save him will probably pay for the drinks bill
I never mentioned an anhydrite leveller. At least 10mm Fibre reinforced leveller, ditra and tile next day?
So have a got this right to pay for a round or two of drinks your going to fix limestone using S&C straight on to UFH pipes, wait(how long) then switch the heating on...braver man than me