let down... misprepresented.. out of their leauge !

Tilers Forums Official Sponsors

sorry timeless i didn't reply as the developer had already subbed out the bathrooms that i advertised on here to m3fitter, you hit the nail on the head m3 that it was a dangling carrot i presume as it is already in the diary and i have all the plans ready for it, sorry it didn't work out with the handyman though, i am always in the area though if you need to sub something out in future
 
So I didn't get to bring the wife down for a few days to stay in the unoccupied room and I didn't do a day's work - so no money either!
I'am definitely going to continue with the wrist bracelet with my address on.
 
Hahaa ... the developer was having his cake and eating it, oh and smearing the leftovers over all of our faces !! Yes I'll give you a shout ritetouch... email me your full details. . And yes I was gutted when I saw his van and it mentioned bathrooms / kitchens / maintenance ! But by then I was committed to him and short on the ground everywhere else and I had to make a decision either to risk my existing contacts / projects or wave bye bye to the new contact. . But basically the developer played us.. as we both quoted for the full job and they hedged their bets, at our expense.. ! If I'd had the full project I would have pulled out all of the stops and completed it, but as I saw other tilers on the job, no big deal, they weren't being left in the lurch. . More money for you ritetouch ! Hahaa
 
Im really confused

- Developer has project
- Developer gets multiple quotes for full job (2 of which are from ritetouch and M3)
- Gives main part of the project to righttouch and 3 bathrooms to M3
- Developer says to M3 if you can just do the 3 bathrooms, you can have another bigger job in SGH. (Developer lied as hed already given SGH to ritetouch)
- M3 puts subbie on 3 bathrooms
- Subbie out of their depth and bolts
- Ritetouch takes over the 3 bathrooms as they were already on site.


Think that's how it went down anyway?
 
Last edited by a moderator:
Hahaa nice one C R exactly in a nutshell. . And the moral of the story is,....................
 
- Developer has project
- Developer gets multiple quotes for full job (2 of which are from ritetouch and M3)
- Gives main part of the project to righttouch and 3 bathrooms to M3
- Developer says to M3 if you can just do the 3 bathrooms, you can have another bigger job in SGH. (Developer lied as hed already given SGH to ritetouch)
- M3 puts subbie on 3 bathrooms
- Subbie out of their depth and bolts
- Ritetouch takes over the 3 bathrooms as they were already on site.


Think that's how it went down anyway?

Could you not have wrote this last night??
Would have saved me a sleepless night. [emoji1]
At least it got sorted & the developer is the one covering all bases (in a very underhand way) [emoji107][emoji107]
 
Could you not have wrote this last night??
Would have saved me a sleepless night. [emoji1]


I could have done but last night when I had more time it would have contained 4 pages of waffle like I normally do. Today I was forced to write the condensed version.

believe me, the condensed version is much better for everyone!
 

Advertisement

Thread Information

Title
let down... misprepresented.. out of their leauge !
Prefix
N/A
Forum
Australia Tiling Forum
Start date
Last reply date
Replies
97

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
m3fitter,
Last reply from
MTiler,
Replies
97
Views
4,307

Thread statistics

Created
m3fitter,
Last reply from
MTiler,
Replies
97
Views
4,307
Back